Skip to main content
Call us on 0117 982 9561
B&A Group Flood Protection
Mountpark B&A Group Recovery and Disposal Avonmouth
Mountpark location

Mountpark Bristol XL

Severnside, Bristol , Mountpark Logistics

Bristol and Avon Group is working closely with Mountpark Logistics at Mountpark Bristol XL, a 60-acre industrial / logistics development site at Avonmouth with planning consent for up to 1.3 million sq. ft.

Our part in this project includes importing 200,000m3 of suitable subsoil under an Environment Agency Bespoke Recovery Permit to raise the land above the flood risk. This has been engineered to the client’s specification and has been independently validated by Structural Soils. Recovering this material has meant that over 340,000 tonnes of material has been diverted from landfill and saved the equivalent raw material, conserving a natural resource. Over the course of the project, we have controlled over 50,000 vehicle movements.

Project details
Client Mountpark Logistics
Dates Dec 2018 - Aug 2020
Services Land Raising & Remodelling Flood Protection Recovery & Waste Disposal Cut & Fill Operations Enabling Works

200000 Subsoil imported
340000 Tonnes diverted from Landfill
50000 Vehicle movements

This has been engineered to the client’s specification and has been independently validated by Structural Soils. Recovering this material has meant that over 340,000 tonnes of material has been diverted from landfill and saved the equivalent raw material, conserving a natural resource. Over the course of the project, we have managed over 50,000 vehicle movements.

In addition to the land raise we have constructed five large attenuation ponds and four newt ponds which will provide a valuable wildlife habitat which will surround the development.

We have also managed service diversions, constructed a new Fire Track and broken out existing hardstanding for recycling.

We delivered this project in half the programmed time. This could cause a huge amount of disruption, but both Mountpark and Bristol and Avon Group were determined to ensure that our impact on the environment and the community was minimal. So, we planned the transport logistics and site set up carefully and fully engaged with local businesses and the community, minimising disruption and meeting the Considerate Constructors Code of Practice.

Mountpark Bristol XL is situated in the South West’s prime distribution location, we wish Mountpark Logistics and the project team every success in the next stage of the development.